Georgia, Tbilisi, Dec. 19 / Trend N. Kirtskhalia /
Dariali Energy has announced a tender to construct the entrance and culvert tunnels at the 108-megawatt Dariali hydroelectric power station on the Terek River.
According to the information, the length of the entrance tunnel will be 340 meters, width 5.5 meters and height 6 meters. The length of culvert tunnel is 500 meters.
Bids must be submitted by Jan. 20, 2012.
Address: 4 Besiki St., Tbilisi.