BAKU, Azerbaijan, September 3. Azerbaijan Railways (ADY), one of the AZCON Holding companies, handled 265 block trains in the eight months of 2025, which is 58 percent more than in the same period of 2024.
The data obtained by Trend from Azerbaijan Railways CJSC shows that during the reporting period, 28,261 TEU container cargo was transported by these trains, marking a year-on-year increase of 67 percent.
Azerbaijan Railways is the state-owned national rail transport provider in the Republic of Azerbaijan. The 2,918 km (1,813 mi) network, with a 1,520 mm gauge, is electrified at 3 kV (3,000 V) DC. The Azerbaijan Railways headquarters is located in the capital, Baku. The inaugural railway line in Azerbaijan was constructed in 1878 and inaugurated in 1880 in the outskirts of Baku. The railway comprises 176 stations, of which Bilajari (in Baku) and Shirvan are fully automated. Twelve stations include container courts equipped with specialized mechanisms and machinery, while three stations—Keshla (in Baku), Ganja, and Khirdalan—are capable of handling high freight containers. In conjunction with the Kars–Tbilisi–Baku railway, a regional rail link project that has directly connected Turkey, Georgia, and Azerbaijan since 2017, Azerbaijan is modernizing its railway lines with new high-speed rolling stock to replace the outdated equipment.