Kyrgyzstan paves 6.4 km of road leading to remote Zardaly village

Kyrgyzstan News 13 November 2026 11:45 (UTC +04:00)
Kyrgyzstan paves 6.4 km of road leading to remote Zardaly village
Khayal Khatamzadeh
Khayal Khatamzadeh
Journalist Read more

BAKU, Azerbaijan, November 13. Kyrgyzstan has paved 6.4 kilometers of the Tayan–Zardaly road in Batken Region, widening the previously narrow and hazardous route up to 10 meters, according to the press service of the Ministry of Transport and Communications.

To expand the roadway and improve vehicle safety, crews conducted blasting operations along mountain slopes. Reinforced concrete barriers are currently being installed along hazardous sections.

Road construction is being carried out under challenging conditions because of the area's mountainous terrain. Nevertheless, work is continuing in stages to provide local residents with safer and more convenient transport access.

Furthermore, the remaining sections of the road will also be improved according to plan, the ministry said.

Zardaly is a remote mountain village in Batken Region, located approximately 110 kilometers from the district center. Until recently, residents faced significant difficulties accessing transport, electricity, and mobile communications. The mountainous routes were particularly difficult to use during winter, when heavy snowfall could disrupt road access for several months.

Meanwhile, in December 2025, Kyrgyzstan commissioned the 18-kilometer Sary-Talaa–Kyzyl-Tash–Zardaly road, built at a cost of 888.9 million soms (approximately $10.2 million). The project included a 30-meter metal bridge over the Kozheshken River and shortened the route to the village by 26 kilometers.

Tags:

Try Trend Premium for 1$
Latest

Latest