ASTANA, Kazakhstan, February 28. The Ministry of Transport of Kazakhstan has summarized its work in 2024 and outlined plans for 2025, Trend reports.
An extended meeting of the Ministry of Transport's Collegium
took place in Astana. During the event, the ministry's work results
for the past year (2024) were summarized, and plans for 2025 were
outlined. The event was attended by Deputy Prime Minister of
Kazakhstan Roman Sklyar, members of the Parliament of Kazakhstan,
Minister of Transport Marat Karabaev, representatives of the
President's Administration and the Government’s Apparatus, and
others.
"In 2024, the road sector saw a record 12,000 km of repair work,
with 7,000 km completed. The main efforts were focused on
completing the reconstruction of major transit corridors: ‘Almaty –
Karaganda’ (879 km), ‘Taldykorgan – Ust-Kamenogorsk’ (768 km), and
‘Aktobe – Atyrau – Astrakhan’ (607 km). To date, work on these
sections is completed. In the railway transport sector, cargo
transportation grew by 2 percent, totaling 303 million tons (297.4
million tons in 2023, expected 310 million tons in 2025). This is a
historic record. Rail transport carried 21 million passengers,
marking a 4 percent increase. Last year, 185 locomotives, 2,350
freight cars, and 143 passenger cars were purchased. Maritime
transport handled 7.5 million tons of cargo, an increase of four
percent,” said Minister of Transport Marat Karabaev.
Meanwhile, road transport has shown the highest growth in cargo transportation compared to other transport sectors. Annually, the growth rate in export-import routes exceeds 20 percent, while transit growth is around 40 percent. Chinese transit has increased by two times or more. Last year, we fully transitioned to electronic permits with China and Uzbekistan. As a result, the number of trips with Uzbekistan has increased from 6,000 to 36,000 over the past two years, and with China – from 50,000 to 230,000,” added Minister Karabaev.
In his speech, the Transport minister also discussed plans for 2025. This year, road construction will cover 13,000 km. New projects totaling 1,045 km in length will be launched, including the sections “Aktobe – Ulgaysyn” (234 km), “Karaganda – Zhezkazgan” (572 km), “Atyrau – Dossor” (86 km), and bypasses for the cities of Saryagash (102 km), Kyzylorda (26 km), Rudny (17 km), and Petropavlovsk (8 km). The construction of railroads Dostyk-Moiynty and the bypass around Almaty will be completed, and the construction of the Kyzyljar-Moiynty project will begin.
''This year, 54 railway stations will undergo repairs and reconstruction. The construction of a container hub at the Aktau port with a capacity of 250,000 containers will be completed, and dredging works will be carried out. Sixteen new routes are planned, including Rome, Munich, Budapest, Shanghai, Guangzhou, and Busan. Budget routes for passengers will be expanded with the arrival of four new foreign low-cost airlines: SpiceJet (India), Eastar Jet and T’way Air (Korea), and ThayAirAsia (Thailand). The use of electronic permits completely eliminates human error and related corruption risks. Work is already underway to transition to electronic permits with the Organization of Turkic States (Türkiye, Azerbaijan, Kyrgyzstan) and the Baltic States (Russia, Latvia, Lithuania),'' the minister emphasized.
Concluding the meeting, Deputy Prime Minister of Kazakhstan Roman Sklyar gave several specific instructions for further improving the development of the country's transport and logistics sector. In the civil aviation sector, last year, Kazakh Airlines carried 14.7 million passengers, which is an 11 percent increase compared to 2023 (13.3 million). Airports served 29.7 million people (26.1 million), with a 14 percent growth, and processed 171,000 tons of cargo (145,000), an 18 percent increase.
