Turkmenistan, Ashgabad, April 19 /Trend, H. Hasanov/
On behalf of the jury involved in selection of suppliers to the oil & gas industry of Turkmenistan, Turkmenbashi-operating oil refinery on April 18 announced international tender over the development of feasibility study of construction of a new oil refinery near to settlement of Okarem in the Balkan province.
To partake in the tender, all sides are offered the following:
- To submit written application on participation in the tender, with the indication of full name, legal status, country of registration, and banking details;
- To acquaint with the rules of conduct of "Tender on selection of contractors for the designing and construction of production and public facilities of the Oil & Gas Industry and Fishing Economy of Turkmenistan";
- To receive a package of tender documents through paying $1,150
Tender offers shall be submitted to the Turkmenbashi oil refinery's Second Division situated at:
Turkmenistan, Balkan province, Turkmenbashi Highway, Turkmenbashi Oil Refinery. The deadline for applications is 16.00, July 20, 2011
The account money should be transferred to for the package of tender documents will be indicated upon the submission of written application.
Packages containing tender offers shall be delivered to the aforesaid address since the announcement of published and shall be considered upon money transition to the said account.
Contact telephone numbers: +993 (243) 2-45-44; 2-37-94; 2-07-24; 2-50-91
Performance specification is attached.
Below is given performance specification for the development of feasibility study of construction of a new oil refinery near to settlement Okarem of the Balkan province.
1. Project's aim
1.1 Integrated crude oil, gas condensate and petrochemicals refining for the production of competitive, high-quality products in conformity with the strictest international requirements
1.2 Drafting a feasibility study for the construction of a new oil refinery or gas & petrochemical plant in the Balkan province
2. Whereabouts of the being designed facility
2.1 Turkmenistan, Balkan province, the area of settlement Okarem
3. Customer
3.1 Turkmenbashi Oil Refinery
4. Terms of construction works
4.1 New "turnkey" construction at a new construction platform
5. Basic requirements and tasks
The following should be taken into account when feasibility study is under preparation:
5.1. The refinery should meet strict international technical requirements, which have been in effect and are expected to take effect in the observable future
5.2. Under refinery's operation, the existing and to-be nature protection and ecological safety international standards meeting local and international requirements should be observed
5.3. The designing and construction of a new refinery should be based upon modern technologies and equipment to provide safe, reliable and long-term operation of the refinery's objects
5.4 The refinery should be supplied with electricity from at least two independent, highly reliable sources capable of substituting one another in the event of temporary cut of power supply from one of them.
5.5 The refinery should be flexible enough to cope with crude oil supply changes or oscillations in demands for certain kinds of refined products, in correspondence with changes of market situation or consumer tendencies
5.6 There should be examined all potential sources of crude oil supply to a new refinery, as well as the volume and composition of oil, natural gas and bypass gas supplied by the State Concerns Turkmenneft and Turkmengaz and the State Agency for Hydrocarbon Resources, which is part of the President's Office of Turkmenistan. Following the results of data analysis, the refining capacity of a new refinery should be fixed at 3.0 million tons per year with a subsequent increase up to 5.0 million tons per year
5.7 There should be examined different options of a new refinery scheme, and the most optimal one (most efficient both technically and economically) should be chosen upon agreement with Customer for the reasons of further examination
5.8 To explore the opportunities of world's key licensors in installing polyolefine production units for the reasons of use of combined (ethane, propane, butane, gas condensate, and once-run gasoline) raw materials. Marketing prospects in this region - marketing studies of sales market, and identification of potential export products, markets and prices - should be taken into account.
5.9 The assortment and quality of products to be refined shall be adopted with relation to the EU Euro-5 and Euro-6 requirements
The refinery should be specialized in production of high-octane gasoline A-98, basic motor oils of groups 3, 4 and 5 according to the API synthetic oil standard, and synthetic washing detergents
5.10 The entire offered technological processes should be assessed according to indicators given below:
- Amount of capital investments;
- Production and repair costs;
- Current experience of industrial use;
- Technological guarantees;
- Output and quality of products;
- Use of special catalysts, reagents or additives;
- Raw material quality requirements;
- Process safety;
- Ecological indicators;
- Oil refining depth (it should be not lower than 95 percent)
- Energy resources and infrastructure
5.11 The feasibility study should be inclusive of the following sections (other ones are not excluded):
- Brief review of project (review of references, patents; results of industrial application, specification of refinery's configuration, description of options, etc.)
- Information about Licensors;
- Description of processes (initial designing data, phase-to-phase development plan, distributed management system, and nature protection system), metrological provision of production;
- Analysis results, technological block diagrams, general economic conditions;
- Project's economic indicators (calculation of project-related estimated cost, and period of recoupment);
- Conceptual financing plan (project's value, financing terms and conception, transport scheme, financial provision package, sources of financing);
- Payback of credits and investments;
- Potential technology and equipment suppliers;
- Detailed description of distributed management system;
- Products and market commercial quality review;
- Power supply and infrastructure;
- Logistics, marketing, storage, unloading and transportation of refined products