Azerbaijan, Baku, April 20 / Trend /
The State Oil Company of Azerbaijan Republic (SOCAR) launched drilling of two wells in the field "Oil Rocks", the company reported.
The company drills one well with design depth of 2,560 meters on the platform "Oil Rocks-1887". Expected daily production of this well is 30 tons.
The second well is drilled on the platform "Oil Rocks 2426". Its design depth is 1,980 meters, and the expected daily debit is 12 tons.
The measures are being implemented within the framework of an Azerbaijani presidential decree to increase production at the Neft Dashlari OGPU from 812,000 to 1.2 million tons (1.5 times).
According to SOCAR's geologists, the residual amounts of oil at the field "Oil Rocks" is 30 million tons. SOCAR will drill 78 new wells by late 2010 to increase oil production at the field.
SOCAR President Rovnag Abdullayev said earlier that the residual recoverable oil and gas reserves of Oily Rocks exceed 182 million tons of oil.
The volume of geological reserves of this field is 365 million tons. In accordance with the current project on development of the field, development of the "Oil Rocks" field should be completed in 2035.