BAKU, Azerbaijan, October 21. Uzbekneftegaz JSC completed an overhaul at well No.51 of the Khodjikazgan field (country’s Bukhara region), Trend reports via the company's statement.
As a result of the work carried out, an industrial gas flow of 150,000 cubic meters of gas and 1.5 tons of gas condensate per day was obtained.
The Khodjikazgan gas condensate field is located in the Karakol district of the Bukhara region and was put into operation in 2006.
Previously, Uzbekneftegaz JSC drilled new well No.7p at the Garbiy Tegirmon field (also in Bukhara region).
As a result of the work carried out, an industrial gas flow of 55,000 cubic meters of gas and 1 ton of gas condensate per day was obtained.
---
Follow the author on Twitter: @NatavanRzayeva5
