...

Bridge over Baku Bay Expected to be Constructed within Five years

Business Materials 21 May 2008 18:10 (UTC +04:00)

Azerbaijan, Baku, 21 May / Trend corr. E.Ismayilov / The Korean company Dongsung Engineering will develop feasibility study and design of the project on construction of the bridge over the Baku bay. The cost of the project is estimated at $1.4bln, Musa Panahov, Deputy Transport Minister of Azerbaijan, stated on 21 May.

As per the initial design, length of the first sea part of the bridge is 14km. Construction of the bridge is expected to be completed within five years. Azerbaijan will not invest into the project.

The bridge will connect the two edges of Baku bay (in Bayilov and Zikh settlements), and will enable to ship transport infrastructure in Baku.

The correspondent can be contacted at:[email protected]  

Latest

Latest