BAKU, Azerbaijan, Feb.11
By Natavan Rzayeva - Trend:
Uzbekneftegaz JSC has successfully completed an overhaul at well No.59 of the Shimoliy Berdak field, Trend reports citing the press service of the company.
As a result of the perforation work carried out, an industrial gas flow of 250,000 cubic meters and 2 tons of gas condensate per day was obtained.
The Shimoliy Berdak gas condensate field is located in the Muynak region of the Republic of Karakalpakstan in Uzbekistan and was put into operation in 2005.
Previously, Uzbekneftegaz JSC has successfully completed an overhaul at well No.146 of the South Kemachi field. As a result of the perforation work carried out, an industrial gas flow of 50,000 cubic meters and 1.3 tons of gas condensate per day was obtained.
---
Follow the author on Twitter:@NatavanRzayeva5