BAKU, Azerbaijan, October 15. Uzbekneftegaz JSC drilled new well No.47 at the Tailok field (country’s Bukhara region), Trend reports via the company's statement.
As a result of the work carried out, an industrial gas flow of 136,000 cubic meters of gas and 2 tons of gas condensate per day was obtained.
The Tailok gas condensate field is located in the Karakul district of the Bukhara region and was commissioned in 2013.
Previously, Uzbekneftegaz JSC developed new well No.23 at the Kuyi Surgil field (Republic of Karakalpakstan).
As a result of the work carried out, an industrial gas flow of 650,000-700,000 cubic meters of gas and 5.5 tons of gas condensate per day was obtained.
---
Follow the author on Twitter: @NatavanRzayeva5